UGAMATV has gathered a verified compendium of projects executed by Professor Senator Ike Ekweremadu Ph.D, CFR. His Excellency, Senator Ike Ekweremadu have been the Senator of Enugu west district, Enugu state, Nigeria from 2003 to 2023. He was the Deputy president of Nigeria senate from 2007 to 2019. And Speaker of Ecowas parliament from 2011 to 2015
ANINRI LGA ENUGU STATE
CATEGORY A: ROAD CONSTRUCTION/REHABILITATION,EROSION CONTROL/BRIDGES
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Oji – Achi – Mmaku – Awgu – Ndeaboh – Mpu – Akaeze Road Section II. 45km Express Road. | 2011 – 2015 | Completed with Asphalt & Bridges | Economic Corridor linking 5 States directly |
2. | Nenwe – Oduma – Uburu Road Spur Ishiagu Mile II 40km Express Road. | 2013 – 2017 | Completed with Asphalt & Bridges | Economic Corridor linking 2 States directly |
3. | Nenwe – Nomeh – Nara – Mburumbu Road Spur to Obeagu Oduma Funding Continues. | 2016 – 2022 | Ongoing | Economic CorridorOpened |
4. | Ihuejiru Mpu – Ofia – Agueyi – Oduma Bypass 6.4km, Asphalted. | 2016 – 2020 | Completed | Access provided Economy improved |
5. | Neochelle Ndeaboh Rail Station Road 1.5km, Asphalted. | 2018. 2021 | Completed | Access provided Economy improved |
6. | Ndeaboh – Nenwe Road Rehabilitation 3.5km, Asphalted. | 2011. 2014 | Completed | Access provided Economy improved |
7. | Imuno Mpu Road Rehabilitation 1.5km, Asphalted. | 2011. 2014 | Completed | Access provided Economy improved |
8. | Isiovia/Imuno Farm Road Rehabilitation 2km. | 2019. 2022 | Completed | Access provided Economy improved |
9. | Obeagu Ezza Mpu Road Rehabilitation 2km, Asphalted. | 2013. 2018 | Completed | Access provided Economy improved |
10 | Azunkwo – Ezza Mpu Road Rehabilitation 3km. | 2018 – 2021 | Ongoing | Access provided Economy improved |
11. | Ndeaboh – Ezinesi Oduma link Road Construction 6km. | 2019. 2021 | Section Completed | Farm Roads opened |
12. | Ohafia Oduma Station Road Rehabilitation 1km, Asphalted. | 2018. 2019 | Completed | Access provided Economy improved |
13. | Amankpume – Ezinesi Oduma | 2018 | Section Completed | Access provided Economy improved |
14. | Agugwu Amagu Mpu Road Rehabilitation 1.5km. Completion in 2022 Budget. | 2021 | Section Completed | Access Road opened Economy improved |
15. | Nzerem Amachalla Road Rehabilitation 1.5km, Asphalted.Reconstruction in 2022 Budget. | 2013 – 2015 | Section Completed | Access Road opened Economy improved |
16. | Rehabilitation of Awgu – Ndeaboh – Mpu – Okpanku – Akaeze Road Odoekpuru Aneke Oji Interchange. FERMA | 2019 | Completed | Access Road opened Economy improved |
17. | Amagu Mpu Road Bypass 1km, Asphalted. | 2017. 2021 | Completed | Access Road opened Economy improved |
18. | Ihuibe – Ihuezoke Okpanku Road Rehabilitation 2.4km, Asphalted. | 2016. 2021 | Completed | Access Road opened Economy improved |
19. | Okpu Okpanku/Dam/Afor Market Bypass RoadRehabilitation 2km, Asphalted. | 2012. 2016 | Completed | Access Road opened Economy improved |
20. | Agbada Okpu Town School Road Rehabilitation 1km. | 2020 | Section Completed | Access Road opened Economy improved |
21. | Iyapo Amabiriba Okpanku Road Rehabilitation 1km, Asphalted. | 2017. 2019 | Completed | Access Road opened Economy improved |
22. | Amabiriba Utin Road Rehabilitation 1.5km. | 2017 – 2019 | Section Completed | Access Road opened Economy improved |
23. | Amaogudu – Amagu – Ameze Okpanku Road Rehabilitation 3.5km, Asphalted | 2012. 2013. 2018. 2020 | Section Completed | Access Road opened Economy improved |
24. | Amaeze – Ihuezoke Road Rehabilitation Spur to Onuakparate Ihuibe 2.6km. | 2018 | Completed | Access Road opened Economy improved |
25. | Afor Amaogudu Ekpo Okpanku Road Rehabilitation 1.5km | 2021 | Section Completed | Access Road opened Economy improved |
26. | Onu – Agbana – Obunagu Amagu Amakona 1km. | 2014 | Completed | Access Road opened Economy improved |
27. | Ovum – Obinagu Erosion/Road Rehabilitation Okomigbo 500m | 2015 | Completed | Access Road opened Economy improved |
28. | Ogbombara Access Road Rehabilitation to Spring Water Projects. Agboechara | 2015, 2017 | Completed | Access Road opened Economy improved |
29. | Provision of Rural Access Mobility & Infrastructure for Ihuezeoke and Amaeze Fishing Communities. | 2019 | Section Completed | Access Road opened Economy improved |
30. | Imuno – Isiovia One Span RC Bridge. Amakovia. | 2017 | Section Completed | Economic Link |
31. | Emudo Community Road Rehabilitation Nenwe 2.0km. | 2014. 2015. 2016 | Asphalt. | Access provided |
32. | Amorji Community Road Rehabilitation Nenwe 2.4km. | 2018. 2019 | Asphalt | Access provided |
33. | Station Road Rehabilitation Ohafia Oduma 0.5km | 2019 | Asphalt | Access provided |
CATEGORY B: WATER SUPPLY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Spring Source Harvestation and 4km Pipeline Reticulation Mpu. | 2004 | Completed | Improved Livelihood |
2. | Ogbombara Spring Water Harvestation and 1km Pipeline Reticulation Ndeaboh. | 2014, 2015 | Improved Livelihood | |
3. | Ivo Dam Water Supply Irrigation. | 2009 – 2018 | 40% Completed | Improved Water Supply, Agriculture and Fishing |
4. | Ivo Water Harvestation and Pipeline Project Okpu Ekoli. | 2009, 2011, 2013 | 40% Completed | Improved Water Supply, Agriculture and Fishing |
WATER FOR ALL INITIATIVE | ||||
5. | Shallow Borehole Imuno Amakovia. | 2018 | Completed | Improved Livelihood |
6. | Shallow Borehole Iyapo Amabiriba Okpanku. | 2018 | Completed | Improved Livelihood |
7. | Shallow Borehole Onuakanu Amabiriba Okpanku. | 2018 | Completed | Improved Livelihood |
8. | Shallow Borehole Okpu Town Hall Ekoli. | 2018 | Completed | Improved Livelihood |
9. | Shallow Borehole, Overhead Tank Storage and Public Taps. Ezinesi Oduma | 2019 | Completed | Improved Livelihood |
10. | Shallow Borehole, Overhead Tank Storage and Public Taps. Obeagu Oduma | 2019 | Completed | Improved Livelihood |
11. | Shallow Borehole, Overhead Tank Storage and Public Taps. Gary Processing Plant. Aneke Orji | 2019 | Completed | Improved Livelihood |
12. | Shallow Borehole, Overhead Tank Storage and Public Taps. Amaogudu Okpanku Farm. | 2019 | Completed | Improved Livelihood |
13. | Shallow Borehole, Overhead Tank Storage and Public Taps Openwell. Command Secondary School Mpu | 2021 | Ongoing | Improved Livelihood |
14. | Shallow Borehole, Overhead Tank Storage and Public Taps. Emudo Nenwe | 2018 | Completed | Improved Livelihood |
15. | Shallow Borehole, Overhead Tank Storage and Public Taps. Agugwu Amagu Farm Mpu | 2018 | Completed | Improved Livelihood |
16. | Shallow Borehole, Overhead Tank Storage and Public Taps Openwell. Sports Stadium Ndeaboh | 2019 | Completed | Improved Livelihood |
17. | Shallow Borehole, Overhead Tank Storage and Public Taps. St. Anthony Catholic Church Oduma | 2021 | Completed | Improved Livelihood |
18. | Shallow Borehole, Overhead Tank Storage and Public Taps. St. Amankanu Oduma | 2021 | Completed | Improved Livelihood |
19. | Shallow Borehole, Overhead Tank Storage and Public Taps. Eziecho Uhueze Nenwe. | 2021 | Completed | Improved Livelihood |
20. | Shallow Borehole, Overhead Tank Storage and Public Taps. Agbada Nenwe. | 2019 | Completed | Improved Livelihood |
21. | Shallow Borehole, Overhead Tank Storage and Public Taps. Anekeoji I Mpu. | 2021 | Completed | Improved Livelihood |
22. | Shallow Borehole, Overhead Tank Storage and Public Taps. Anekeoji II Mpu. | 2021 | Completed | Improved Livelihood |
23. | Shallow Borehole, Overhead Tank Storage and Public Taps. Amagu Okpanku. | 2019 | Completed | Improved Livelihood |
24. | Shallow Borehole, Overhead Tank Storage and Public Taps. Oduma Achara | 2021 | Completed | Improved Livelihood |
25. | Shallow Borehole, Overhead Tank Storage and Public Taps. St. Nicholas Catholic Church Oduma. | 2021 | Completed | Improved Livelihood |
26. | Design of Irrigation Structures for Dry Season Farming for Okpanku and Mpu Communities. | 2019 | Completed | Increased Farming Potentials |
CATEGORY C: SCHOOL/CHURCH PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Classroom Blocks, Classroom Furniture and VIP Toilets in Community Secondary School. Agugwu Ohafia | 2013 | Completed | Education Improved |
2. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories to the Centre. Community Secondary School, Ekoli Okpanku | 2013 | Completed | Education Improved |
3. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories to the Centres. Community Secondary School, Mpu | 2012 | Completed | Education Improved |
4. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories to the Centres. Community Secondary School, Obeagu Oduma | 2011 | Completed | Education Improved |
5. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories to the Centres. Community Secondary School, Ndeaboh | 2012 | Completed | Education Improved |
6. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories to the Centres. Central School Ndeaboh | 2013 | Completed | Education Improved |
7. | Provision of E – Library Equipments and Installed. Mpu | 2014 | Completed | Education Improved |
8. | Construction of Library Centres, Library Furniture and Supply of Library Books. Community Secondary School, Umunevo, Emudo Nenwe | 2013 | Completed | Education Improved |
9. | Supply of Books and Instructional Materials. Town School, Mpu | 2012 | Completed | Education Improved |
10. | Reconstruction of Building for JAMB CBT Centre. Mpu | 2019 | Completed | Education Improved |
11. | Conversion of Youth Centre Mpu to Command Secondary School. | 2021 | Completed | Education Improved |
12. | Construction of 1 No. 3 Classroom Block and Supply of Furniture. Community Primary School Aguenyi Mpu. | 2020 | Completed | Education Improved |
13. | Construction of Examination Hall and Supply of Furniture Okpanku High School. | 2020 | Completed | Education Improved |
14. | Construction of Mpu Anglican Church, Priest Quarters, Congregation Toilet, Perimeter Fence, Gatehouse and Compound Landscaping. | 2003 – 2012 | Completed and Dedicated | Fulfilled Divine Promise |
CATEGORY D: ELECTRICITY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Rural Electrification High Tension, Low Tension Reticulation of Mpu, Ndeaboh, Okpanku, Nenwe and Oduma Communities. | 2004 – 2010 | Completed | Economy, Livelihood improved |
2. | Power Improvement. Further Rural Electrification and Donation of Transformers. | 2010. 2012 | Completed | Economy, Livelihood improved |
3. | Construction of 132 D Line 2×60 MVA 132 Substations. Mpu | 2010 | Ongoing | Power Upgrade |
4. | Feasibility and New Transmission, 132 Line Project. Ugwuaji – Nenwe | 2010 | Ongoing | Power Upgrade |
5. | Construction/Maintenance of Solar Powered Street Lights in various Communities in Aninri. | 2010. 2012.2013 | Completed | Power Upgrade |
6. | Rehabilitation/Installation of Street Lights, 100KVA Transformer, 65KVA Sound Proof Generating Set and Accessories. Mpu | 2017 | Completed | Economy, Livelihood improved |
7. | 3No. 200KVA Transformer donated to Amankanu Oduma. | 2016 | Done | Economy, Livelihood improved |
8. | 1No. 500KVA Transformer donated to Okpu Ekoli Community. | 2014 | Done | Economy, Livelihood improved |
9. | Procurement of Transformers, Power Cable Replacement, Mpu Street Light. | 2017 | Completed | Economy, Livelihood improved |
CATEGORY E: TOWNHALLS/STADIUM/YOUTH CENTRES/OFFICE PROJECTS
S/N | LOCATION | FUNDING YEAR | STAGE | IMPACT |
1. | Provision of Field Office and Utility Van. Ndeaboh | 2010S | Completed | Service Facilitated |
2. | National Youth Development Centre. Mpu | 2011 – 2016 | Completed | Youth Development Enhanced |
3. | Construction of Town Hall and Extension for Women Empowerment/Training. Ekoli | 2017 | Ongoing | Community Empowerment |
4. | Construction of One Block Aninri East Development Centre. Mpu | 2017 | Completed | Growth of Local Government Administration |
5. | Construction of 2 No. Office Blocks. Aninri South Development Area. Provision of Borehole Okpanku | 2018 | Completed | Growth of Local Government Administration |
6. | Construction of 1 No. Office Block and Perimeter Fence. Aninri East Development Area Headquarters, Mpu | 2018 | Completed | Growth of Local Government Administration |
7. | Multipurpose Hall, Community Mobilization/Empowerment Leadership Centre Project. Mpu | 2016. 2017. 2018 | Ongoing | Community Empowerment.Entrepreneurship |
8. | External Works, Landscaping and Drainage Multipurpose Centre Mpu. | 2020 | Completed | Environmental Upgrade |
9. | Construction of Mini Sports Stadium Ndeaboh:a. Access and Internal Roadb. VIP Pavilionc. Spectators Pavilion Type Id. Spectators Pavilion Type IIe. Football Field, Retaining Wall and Lawn Tennis Courtf. Construction of Perimeter Fence and Gatehouse. | 20192019. 20202020202120212019 | OngoingCompletedOngoingOngoingOngoingOngoing | Provision of Sporting Facilities.Social, Health and Economic Empowerment |
10. | Construction of 1No. Police Station Ndeabohnand Supply of Furniture. | 2018 | Completed | Security Assistance to the Police |
CATEGORY F: HOSPITAL PROJECTS
S/N | LOCATION | FUNDING YEAR | STAGE | IMPACT | |
1. | Construction of Primary Health Centre and Doctors Quarters Ndeaboh. | 2021 | Completed | Access to Rural Quality Health Centre. | |
AWGU LGA ENUGU STATE
CATEGORY A: ROAD CONSTRUCTION/REHABILITATION/EROSION CONTROL/BRIDGES
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Oji – Achi – Mmaku – Awgu – Ndeaboh – Mpu – Okpanku Akaeze Road. Section II 45km. | 2011 – 2015 | Completed.Asphalt, Drainage, Bridges | Vital Economic Corridor |
2. | Construction of UUgwueme – Awgunta – Obeagu. Spur to Mmaka Mgbidi. | 2016 – 2022 | Ongoing | Major Communities vital link.Economy Improved |
3. | Rehabilitation of Old Enugu – Port Harcourt Road up to Abia State Boarder. | 2019 – 2022 | Ongoing | Community Integration to Economic Diversification |
4. | Erosion Control/Road Rehabilitation Rosary High School Awgu. | 2010 – 2011 | Completed.AsphaltedDrainage | Access to Educational Facility enhanced |
5. | Erosion Control/Road Rehabilitation Isu – Awaa Agbudu. | 20102020 | Ongoing | Rural Mobility enhanced. |
6. | Erosion Control/Road Rehabilitation. Mmaku – Mgbidi – Nkwe – Ezere. | 2010 | Integrated to a New Project in No. 2 | Access Opened |
7. | Erosion Control/Road Rehabilitation Okpumodu – Enugu Mmaku Isi – Mmama. | 2014 | Opened with Earthworks and Drainage | Access improved |
8. | Erosion Control/Road Rehabilitation Awgunta – Egwu Achi Road. | 2014 – 2016 | Rehabilitated with Earthworks and Side drains | Access improved |
9. | Erosion Control/Road Rehabilitation Awgu – Ugwueme. | 201420162018 | Rehabilitated.Earthworks snd Drainage.Section Asphalted | Vital Access linking Isu Ochi in Abia State |
10. | Erosion Control/Road Rehabilitation Amoli Community. | 201420152017 | Completed with Asphalt | Community Economy improved |
11. | Erosion Control/Road Rehabilitation, Onoli Awgu Community. | 201420162017 | Section completed with Asphalt | Community Economic access improved |
12. | Erosion Control/Road Rehabilitation Eziama – Ayam Ajata – Agunese Mmaku. | 201420182021 | Completed with Asphalt | Economy improved |
13. | Erosion Control/Road Rehabilitation. Agbogudu Community. | 201420182020 | Completed with Asphalt | Economy improved.Industries linked |
14. | Umuowa – Amata Ituku Erosion Control/Road Rehabilitation. | 201520162018 | Section completed with Asphalt | Community access improved |
15. | Rehabilitation of Oji – Achi – Mmaka – Awgu – Ndeaboh – Mpu – Okpanku – Akaeze Road. Ekpulambo Mgbowo Interchange. FERMA | 2017 | Completed with Asphalt | Community access improved |
16. | Erosion Control/Road Rehabilitation. Ugbo – Ugbonabo Road. | 2009 – 2013 | Completed with Asphalt | Economic Corridor linking many Communities |
17. | Ogwuma Awgu Community Erosion Control/Road Rehabilitation. | 20162018 | Section completed with Asphalt | Community access improved |
18. | Ogbaku – Amuri Erosion Control/Road Rehabilitation. | 2017 | Earthworks and side Drains | Inter Local Government link Road improved |
19. | Rehabilitation od Enugu – Port Harcourt Road Ogbaku Interchange. FERMA | 2020 | Section completed with Asphalt | Inter Local Government link Road improved |
20. | Erosion Control/Road Rehabilitation of Umuhu Owelli Road. | 201620182019 | Completed with Asphalt | Community access improved |
CATEGORY B: WATER SUPPLY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Ugbo Community River source Water Supply Project. | 2009 | Harvestation, Pipeline and Pumping Structures provided | Efforts to provide Portable Water supply |
2. | Rehabilitation of Awgu Town Water Supply. | 20102018 | Spring source Collections, Pipeline and Pumping Structures provided | Portable drinking water provided |
3. | Construction of Water Borehole, Provision of Gen – Set house, Public Taps and Fencing Awgu. | 2012 | Completed | Portable drinking water provided |
WATER FOR ALL INITIATIVE | ||||
4. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Ogugu | 2019 | Completed | Portable Water provided |
5. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Pipeline Transmission. Umuhu Owelli. | 20192021 | Completed | Portable Water provided |
6. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Ekpulambo Mgbowo I. | 2018 | Completed | Portable Water provided |
7. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Ekpulambo Mgbowo II. | 2018 | Completed | Portable Water provided |
8. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Ekpulata Mgbowo. | 2020 | Completed | Portable Water provided |
9. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Agbogugu I. | 2019 | Completed | Portable Water provided |
10. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Agbogugu Integrated Poultry and Agricultural Farm. | 2019 | Completed | Portable Water for drinking and Industrial support |
11. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Awgu Anglican Bishops Court. Awgu | 2021 | Completed | Portable Water provided |
12. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Niger West Anglican Bishops Court Awgu. | 2021 | Completed | Portable Water provided |
13. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Emma Uzo Tevu Village Awgu. | 2021 | Completed | Portable Water provided |
14. | Provision of Shallow Borehole Overhead Tank Storage and Public Taps. Ihe | 2021 | Completed | Portable Water provided |
CATEGORY C: SCHOOL/CHURCH PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories. Urban Secondary School Awgu. | 2011 | Completed | ICT Education improved |
2. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories. Community Secondary School Ugbo. | 2011 | Completed | ICT Education improved |
3. | Construction of Computer Centres, Supply of Computers, Furnitures and other Accessories. Community Secondary School, Ezinesi Mgbidi. | 2011 | Completed | ICT Education improved |
4. | Construction of Library Centres, Supply of Library Furnitures, Books & Instructional Materials. Boys Secondary School Mgbowo. | 2011 | Completed | ICT Education improved |
5. | Construction of Library Centres, Supply of Library Furnitures, Books & Instructional Materials. St. Vincent Secondary School Agbogugu. | 2011 | Completed | ICT Education improved |
6. | Construction of 1No. 6 Classroom Blocks, Supply of Furniture Community Primary School Amoli. | 2020 | Completed | ICT Education improved |
7. | Rehabilitation of WAEC Hall and Laboratory Obeagu Community Secondary School. | 2018Private Funds | Completed | ICT Education improved |
8. | Reconstruction of Catholic Building. Ituku | 2018Private Funds | Completed | Fulfilled Divine Promise |
CATEGORY D: ELECTRICITY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Restoration of Enugu – Awgu – Aninri vandalized Feeder Line. | 2004 | Completed | Electricity Restored |
2. | Provision and Installation of 33.0.415KV Distribution Transformer. Owelli | 2010 | Completed | Power Supply improved |
3. | Provision and Installation of 33/0.415KV Distribution Transformer. Ugbo | 2010 | Completed | Power Supply improved |
4. | Rural Electrification of Awgunta Community High and Low Tension Line connecting Awgunta to Egwu Achi.Installation of Transformers | 20162022 | Ongoing | |
5. | Provision and Installation of 200KVA, 500KVA Transformers at Isu – Awaa. | 2016 | Completed | Power Supply improved |
6. | Provision and Installation of 500KVA Transformer at Awgu Town. | 2015 | Completed | Power Supply improved |
7. | Installation of Solar Panel Streets Lights and Maintenance in many Communities in Awgu LGA. | 20132015 | Completed | Power ImprovementCommunity Security Enhanced |
CATEGORY E: TOWNHALLS/STADIUM/YOUTH CENTRES/OFFICE PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of National Youth Centre Structures and Facilities Awgu. | 2012 | 80% completed | Education Empowerment.Space for Federal Government Agencies |
OJI RIVER LGA ENUGU STATE
CATEGORY A: ROAD CONSTRUCTION/REHABILITATION,EROSION CONTROL/BRIDGES
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Oji – Achi – Mmaku – Awgu – Ndeaboh – Mpu – Okpanku – Akaeze.Section I 39km | 20092022 | Section completed with Asphalt.Ongoing | Economic Corridor |
2. | Ugwuoba – Oji – Udi – 9th Mile – Aboh – Okpatu – Opi Old Express Road. | 20192022 | Section completed with Asphalt.Ongoing | Economic Corridor |
3. | Erosion Control/Road Rehabilitation. Amoli – Enyimba – Achi Communities. | 2010 | Section completed with Earthworks and Drainaage | Access Improved |
4. | Erosion Control/Road Rehabilitation. Akpugoeze – Osibe. | 20102013 | Section completed with Earthworks and Drainage | Access Improved |
5. | Erosion Control/Road Rehabilitation. Ezi – Udogo – Obodo Akwu Achi. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
6. | Erosion Control/Road Rehabilitation. Ekegbo – Ozuda – Umuegbosi. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
7. | Erosion Control/Road Rehabilitation. Ukpa Ujiri – Ndibeoji Lakwa. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
8. | Erosion Control/Road Rehabilitation. Obinagwu – Gragu – Ahani Achi. | 201420152019 | Section completed with Asphalt | Access Improved |
9. | Erosion Control/Road Rehabilitation. Umuama – Umuegbosi Achi. | 20142015 | Section completed with Asphalt | Access Improved |
10. | Erosion Control/Road Rehabilitation. Isikwe Girls Secondary School Road Isikwe. | 20142016 | Completed | Access Improved |
11. | Erosion Control/Road Rehabilitation. Umuabali – Umuchime – Ogbidiukwu. | 2014 | Completed | Access Improved |
12. | Erosion Control/Road Rehabilitation. Amankwo Inyi Road – Inyi Girls Secondary School. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
13. | Erosion Control/Road Rehabilitation. Ihe – Obuona Ujiri. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
14. | Erosion Control/Road Rehabilitation. Umuome Okwe – Umuegbosi Uno. | 2014 | Section completed with Earthworks and Drainage | Access Improved |
15. | Erosion Control/Road Rehabilitation. Egwu Achi – Awgunta. | 20142016 | Section completed with Earthworks and Drainage | Access Improved |
16. | Road Design Project Ugwuoba Akpugoeze Inyi. | 2015 | Awarded | Access Improved |
17. | Erosion Control/Road Rehabilitation. Ezichieze – Iheachi – Ekwelle Enugu Agu Achi. | 20162017 | Completed with Asphalt | Access Improved |
18. | Erosion Control/Road Rehabilitation. Ujiri Market Square – Mgbogu Ndibe Ekwelle Achi. | 20162017 | Completed with Asphalt | Access Improved |
19. | Erosion Control/Road Rehabilitation. Amaekwu – Isikwe. | 201620172019 | Completed with Asphalt | Access Improved |
20. | Erosion Control/Road Rehabilitation. Federal Cooperative College. | 20172018 | Section completed with Asphalt | Access Improved |
21. | Erosion Control/Road Rehabilitation. Efulu Ugwuoba. | 20172018 | Section completed with Earthworks and Drainage | Access Improved |
22. | Erosion Control/Road Rehabilitation. Umuchime Enugu Inyi. | 20172018 | Section completed with Earthworks and Drainage | Access Improved |
23. | Erosion Control/Road Rehabilitation. Ehuhu Achi Court – Umabi Road. | 2018 | Section completed with Earthworks and Drainage | Access Improved |
24. | Erosion Control/Road Rehabilitation. Ugwuoba – Nwandisson Road. | 20202021 | Section completed with Asphalt | Access Improved |
25. | Erosion Control/Road Rehabilitation. Egwu Achi Community. | 20152016 | Completed | Access Improved |
26. | Erosion Control/Road Rehabilitation. Ehuhe Community. | 2016 | Section completed with Earthworks and Drainage | Access Improved |
CATEGORY B: WATER SUPPLY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Water Borehole, Overhead Tank Storage/Service Reservoir, Public Taps, Pump House and Fence. Ahani Achi. | 20142016 | Completed | Portable Water provided |
2. | Construction of Water Borehole, Overhead Tank Storage/Service Reservoir, Public Taps, Pump House and Fence. Umulakwa Achi. | 20152016 | Completed | Portable Water provided |
3. | Construction of Water Borehole, Overhead Tank Storage/Service Reservoir, Public Taps, Pump House and Fence. Amaekwuru Isikwe. | 20152016 | Completed | Portable Water provided |
4. | Construction of Water Borehole, Overhead Tank Storage/Service Reservoir, Public Taps, Pump House and Fence. Akwunubi Akwu Achi. | 20142017 | Completed | Portable Water provided |
5. | Oji River Regional Water Supply Borehole Projects:a. Isiokwe Amankpunato Achi Enugu Inyib. Abo Umuori Umumba Achi | 20162017 | Completed | Portable Water provided |
WATER FOR ALL INITIATIVE | ||||
6. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Isikwe Achi I. | 2019 | Completed | Portable Water provided |
7. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Isikwe Achi II. | 2019 | Completed | Portable Water provided |
8. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Awlaw. | 2019 | Completed | Portable Water provided |
9. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Police College Oji. | 2021 | Completed | Portable Water provided |
10. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Agbadala Achi. | 2021 | Completed | Portable Water provided |
11. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Ehuhe Achi. | 2021 | Completed | Portable Water provided |
12. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Amankwo Inyi. | 2021 | Completed | Portable Water provided |
13. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Enugu Inyi. | 2021 | Completed | Portable Water provided |
14. | Provision of Deep Borehole, Overhead Tank Storage/Service Reservoir and Public Taps. Ahani Achi. | 2021 | Completed | Portable Water provided |
CATEGORY C: SCHOOL/CHURCH PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Computer Centre, Supply of Computers, Furniture and Accessories. Girls High School Inyi. | 20122014 | Completed | Quality of Education improved |
2. | Construction of Computer Centre, Supply of Computers, Furniture and Accessories. Urban Secondary School Oji. | 20122014 | Completed | Quality of Education improved |
3. | Construction of Library, Supply of Furniture and Books. Boys High School Inyi. | 20122014 | Completed | Quality of Education improved |
4. | Construction of 1No. 6 Classroom Blocks and Supply of Furniture. Community Primary School Alum Inyi. (Private Funds) | 2020 | Completed | Quality of Education improved |
5. | Construction of 1No. 3 Classroom Blocks and Supply of Furniture. MCBSS Inyi. | 2021 | Completed | Quality of Education improved |
CATEGORY D: ELECTRICITY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction and Maintenance of Solar Panels and Street Lights:a. Isikwe Achib. Inyic. Oji Urband. Ahani Achie. Agbadala Achif. Enugu Agu Achig. Akwu Achih. Egwu Achi | 20102014 | Completed | Enhanced Rural Economy and Security |
CATEGORY E: TOWNHALLS/STADIUM/YOUTH CENTRES/OFFICE PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Youth Centre. Achi | 20102016 | Completed | Youth and Education Empowerment |
EZEAGU LGA ENUGU STATE
CATEGORY A: ROAD CONSTRUCTION/REHABILITATION,EROSION CONTROL/BRIDGES
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Erosion Control/Road Rehabilitation Nkwo Agana Amandim – Amagu. | 201420162018 | Completed with Asphalt | Community Access improved |
2. | Erosion Control/Road Rehabilitation Amansiodo – Imeze Oghe | 20152016 | Section completed with Asphalt | Community Access improved |
3. | Erosion Control/Road Rehabilitation Awha – Oyofo – Imane Iwollo. | 20152016 | Section completed with Asphalt | Community Access improved |
4. | Erosion Control/Road Rehabilitation Okpueze Umumba Ndiuno. | 20152016 | Section completed with Asphalt | Community Access improved |
5. | Erosion Control/Road Rehabilitation Awene Oho – Mgbagbuowa. | 20152016 | Section completed with Asphalt | Community Access improved |
6. | Erosion Control/Road Rehabilitation. Obinagu Imama Akamaoghe | 20172018 | Section completed with Asphalt | Community Access provided |
7. | Erosion Control/Road Rehabilitation. Ogwofia Owa | 20172018 | Section completed with Asphalt | Community Access provided |
8. | Erosion Control/Road Rehabilitation. Amamdim Ibite | 2010 | Section completed with Asphalt | Community Access provided |
9. | Erosion Control/Road Rehabilitation. Imezi Owa Ekealim Aguobu Owa | 201920202021 | Section completed with side Drains, Earthwork | Community Access provided |
10. | Erosion Control/Road Rehabilitation. Oye Owa Ekeazu obeleagu Umana | 2019 | Section completed with side Drains, Earthwork | Community Access provided |
11. | Erosion Control/Road Rehabilitation. Isiokwe Akama Oghe | 2021 | Section completed with Earthworks | Community Access provided |
CATEGORY B: WATER SUPPLY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Provision of Deep Borehole, Overhead Tank Storage and Taps. Electricity Connection Generating Set. Obinagu Imama Akama Oghe. | 2013 | Completed | Portable Water provided |
2. | Provision of Deep Borehole, Overhead Tank Storage and Public Taps. Sacred Heart Iwollo | 2018 | Completed | Portable Water provided |
3. | Provision of Deep Borehole, Overhead Tank Storage and Public Taps. Akama Oghe Enugu Na Agbani | 2018 | Completed | Portable Water provided |
4. | Provision of Deep Borehole, Overhead Storage/Service Tank and Public Taps. Imama Iwollo I | 2020 | Completed | Portable Water provided |
5. | Provision of Deep Borehole, Overhead Storage/Service Tank and Public Taps. Queen of Holy Rosemary Parish Imama Iwollo. | 2018 | Completed | Portable Water provided |
6. | Provision of Deep Borehole, Overhead Storage/Service Tank and Public Taps. Sedes Sapientum Girls College Oghe | 2020 | Completed | Portable Water provided |
7. | Provision of Deep Borehole, Overhead StorageTank and Public Taps. Obinagu Imama Iwollo | 2012 | Completed | Portable Water provided |
8. | Provision of Deep Borehole, Overhead Storage Tank and Public Taps. Obinofia Ndi Uno I | 2018 | Completed | Portable Water provided |
9. | Provision of Deep Borehole, Overhead Storage Tank and Public Taps. Obinofia Ndi Uno II (Counter Part) | 2018 | Completed | Portable Water provided |
10. | Provision of Deep Borehole, Overhead Storage/Service Tank and Public Taps. Omoghu Community | 2021 | Completed | Portable Water provided |
11. | Provision of Deep Borehole, Overhead Storage/Service Tank and Public Taps. Isiokwe Akama Oghe Community | 2021 | Completed | Portable Water provided |
12. | Provision of Shallow Borehole, Overhead Storage/Service Tank and Service Taps. Umuonaga Umumba Ndiuno. | 2021 | Completed | Portable Water provided |
CATEGORY C: SCHOOL/CHURCH PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of 1No. 6 Classrooms Block, Classroom Furniture and VIP Toilets Aguobu Owa High School. | 20122014 | Completed | Education Empowerment |
2. | Construction of 1No. 6 Classrooms Block, Classroom Furniture and VIP Toilets. Community Secondary School. | 20122014 | Completed | Education Empowerment |
3. | Construction of Computer Centre, Supply of Computer, Furniture and other Accessories. Community Secondary School Obelagu Umama. | 20122014 | Completed | Education Empowerment |
CATEGORY D: ELECTRICITY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Supply and Installation of Solar Street Lights in many Communities. | 20102010 | Completed | Improved Livelihood |
2. | Donation of 500KVA Transformer to Ishiagu Umumba Community. | 2017 | Completed | Improved Livelihood |
3. | Donation of 500KVA Transformer to Ogwofia Owa Community. | 2017 | Completed | Improved Livelihood |
CATEGORY E: TOWNHALLS/STADIUM/YOUTH CENTRES/OFFICE PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | National Youth Development Centre. IwolloConstruction stopped because of Destruction | 2013 | Abandoned | Nil |
UDI LGA ENUGU STATE
CATEGORY A: ROAD CONSTRUCTION/REHABILITATION,EROSION CONTROL/BRIDGES
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Rehabilitation of Ugwuoba – Udi – 9th Mile – Aboh – Opi Road (Old Federal Road). | 2019 – 2022 | Section completed with Asphalt | Economic Corridor improved |
2. | Construction of Umulumgbe – Umuoka – Amokwu Affa – Egede Awhum Road. | 2019 – 2022 | Section completed with Asphalt | Economic Corridor improved |
3. | Erosion Control/Road Rehabilitation. Amokwe Community Road. | 20102013 | Section completed with Asphalt | Community Access Road improved |
4. | Erosion Control/Road Rehabilitation. Umuavulu Abo Community Road. | 20102013 | Section completed with Asphalt | Community Access Road improved |
5. | Erosion Control/Road Rehabilitation. Enugu Obinagu. | 201020132019 | Section completed with Asphalt | Community Access Road improved |
6. | Erosion Control/Road Rehabilitation. Ukama. | 201020132019 | Section completed with Asphalt | Community Access Road improved |
7. | Erosion Control/Road Rehabilitation. Obinagu Umuabi. | 201620182020 | Section completed with Asphalt | Community Access Road improved |
8. | Erosion Control/Road Rehabilitation. Aguma Enuabor – Umuozor Abor. | 20152016 | Section completed with Asphalt | Community Access Road improved |
9. | Erosion Control/Road Rehabilitation. Umuovu – Anekeze – Umuanum Okwum Egede. | 20152016 | Section completed with Asphalt | Community Access Road improved |
10. | Erosion Control/Road Rehabilitation. Cathedral Church Road Nkwoagu Umuabi – FRSC Academy. | 201420152017 | Completed | Community Access Road improved |
11. | Erosion Control/Road Rehabilitation. Eziama Okpatu. | 201420162018 | Completed | Community Access Road improved |
12. | Erosion Control/Road Rehabilitation. Amukwu Okpatu 1km. | 2018 | Completed | Community Access Road improved |
13. | Erosion Control/Road Rehabilitation. Amukwu Okpatu Link Completion | 2021 | Ongoing | Community Access Road improved |
14. | Erosion Control/Road Rehabilitation. Okpatu Tourist Hill. | 2021 | Ongoing | Community Access Road improved |
15. | Erosion Control/Road Rehabilitation. Community High School – Iyi Ogor Affa. | 2016 | Section completed | Community Access Road improved |
16. | Erosion Control/Road Rehabilitation. Eziama Edem Umulumgbe. | 2017 | Ongoing | Community Access Road improved |
17. | Erosion Control/Road Rehabilitation. Amagu Ebe. | 20202021 | Section completed with Earthworks and side Drains | Community Access Road improved |
18. | Erosion Control/Road Rehabilitation. Umuneke Umuabi. | 2021 | Section completed with Earthworks and Asphalt. | Community Access Road improved |
19. | Construction of 1km Road Umuonenyi. | 20102019 | Completed | Community Access Road improved |
20. | Amebu/Amadia Umuoka Rural Road Rehabilitation Project. | 20102019 | Completed | Community Access Road improved |
21. | Ikenga Umuoka Community Road/Erosion Project. | 20182019 | Completed | Community Access Road improved |
22. | Ekpe Erosion Control project. | 20182019 | Completed | Community Access Road improved |
23. | Erosion Control/Road Rehabilitation. Egede II. | 20172018 | Completed | Community Access Road improved |
24. | Abia Erosion Control Project. | 20182021 | Earthworks, Side Drains ongoing | Community Access Road Improved |
CATEGORY B: WATER SUPPLY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of Borehole, Overhead Storage Tank/Service Reservoir, Public Taps, Pumping House and Fence. Amani Ibite Okpatu. | 20142016 | Completed | Portable Water provided |
2. | Construction of Borehole, Overhead Storage Tank/Service Reservoir, Public Taps, Pumping House and Fence. Umuaga Town. | 20142016 | Completed | Portable Water provided |
3. | Construction of Borehole, Overhead Storage Tank/Service Reservoir, Public Taps, Pumping House and Fence. Egede. | 20142016 | Completed | Portable Water provided |
4. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Umuoka (On Counter Part). | 2018 | Completed | Portable Water provided |
5. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Udi I (Ugochukwu Agballa). | 2018 | Completed | Portable Water provided |
6. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Udi II. | 2019 | Completed | Portable Water provided |
7. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Udi III. | 2019 | Completed | Portable Water provided |
8. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Abia I. | 2020 | Completed | Portable Water provided |
9. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Offeke Abia. | 2020 | Completed | Portable Water provided |
10. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Ukana. | 2020 | Completed | Portable Water provided |
11. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Okpatu . | 2020 | Completed | Portable Water provided |
12. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Ngwo. | 2019 | Completed | Portable Water provided |
13. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Nachi. | 2019 | Completed | Portable Water provided |
14. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. St. Mary Pro – Cathedral Udi. | 2021 | Completed | Portable Water provided |
15. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Ngwo Industrial Layout I. | 2019 | Completed | Portable Water provided |
16. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Ngwo Industrial Layout II. | 2019 | Completed | Portable Water provided |
17. | Provision of Deep Borehole, Overhead Storage Tank/Service Tank and Public Taps. Oma Eke Community. | 2018 | Completed | Portable Water provided |
18. | Community Construction of Motorized Borehole Ikenga/Umualia Community. | 20182019 | Completed | Portable Water provided |
CATEGORY C: SCHOOL/CHURCH PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Construction of 1No. 6 Classroom Blocks, Classroom Furniture and VIP Toilets. Community High School Amokwe. | 20132015 | Completed | Access to Education improved |
2. | Construction of Library Centre, Supply of Library Furniture and Supply of Books. Community Primary School Ukana. | 20132015 | Completed | Access to Education improved |
3. | Construction of 1No. 3 Classroom Blocks and Supply of Furniture. Obioma Community High School. | 2021 | Completed | Access to Education improved |
4. | Construction of Mega Primary School. Umuoka | 20182019 | Completed | Access to Education improved |
5. | Fencing and External Works of Mega Primary School. Umuoka | 20182019 | Completed | Access to Education improved |
CATEGORY D: ELECTRICITY PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Donation of 1No. 500KVA Transformer and Installation. Umulumgbe. | 2017 | Completed | Improvement on Quality of Life |
2. | Donation of 1No. 500KVA Transformer and Installation. Ebe. | 2017 | Completed | Improvement on Quality of Life |
3. | Donation of 1No. 500KVA Transformer and Installation. Eziama Okpatu. | 2016 | Completed | Improvement on Quality of Life |
4. | Installation and Maintenance of Solar Powered Street Light in many Communities. | 20102015 | Completed | Improvement on Quality of Life |
CATEGORY E: TOWNHALLS/STADIUM/YOUTH CENTRES/OFFICE PROJECTS
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | National Youth Development Centre. Ngwo. | 2012 – 2017 | Completed | Youth Empowerment |
2. | Support for the Completion of Nsude Town Hall. | 2018 | completed | Community Empowerment |
CATEGORY F: HOSPITAL PROJECTS
S/N | LOCATION | FUNDING YEAR | STAGE | IMPACT | |
1. | Construction of Primary Health Centre Type A. Umuoka | 20182019 | Completed | Access to Rural Quality Health Centre. | |
2. | Fencing and Landscaping of Primary Health Care Centre Type A. Umuoka. | 20182019 | Completed | Access to Rural Quality Health Centre. | |
PROJECTS IN ENUGU EAST SENATORIAL ZONE
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Nenwe – Nomeh – Nara – Mburumbu Spur to Obeagu Oduma Road Construction. | 2016 – 2022 | Ongoing | Economic Corridor created |
2. | Ozalla – Obe – Agbanic – Amagunze – Ihuokpara – Ebonyi Boarder Road Rehabilitation. | 2017 – 2022 | Ongoing | Interstate Economic created |
3. | Reconstruction of Street Roads at Independence Layout Enugu (Section allocated to Federal Ministry of Works). | 2010 – 2012 | Ongoing | Urban Renewal |
4. | Erosion Control/Road Rehabilitation. Ogbeke Community Enugu East LGA. | 20182019 | Completed | Community Access Road provided |
5. | Erosion Control/Road Rehabilitation Nomeh River side Community, Nkanu East LGA. | 201620172018 | Completed | Community Access Road provided |
6. | Erosion Control/Road Rehabilitation. Ihenyi – Post Office Road Ehamufu. Isi Uzo LGA. | 201620172018 | Completed | Community Access Road provided |
7. | Erosion Control/Road Rehabilitation. Ogbaku – Amuri Road. | 201720182019 | Section completed with Asphalt | Economic Corridor provided |
8. | Rehabilitation of Enugu – Port Harcourt Road (Akpasha – Ozalla – Agbaogugu – Ihe – Owelli – Nenwe – Mgbowo – Awgu – Abia State Boarder). | 2017 – 2022 | Section completed with AsphaltOngoing | Economic Corridor improved |
9. | Erosion Control/Road Rehabilitation. Emene – Umuchigbo – Adoration Enugu East LGA. | 2012 – 2017 | Section completed with Asphalt | Economic Corridor improved |
10. | Erosion Control/Road Rehabilitation. Total Filling Stationn Attakwu Akegbe Ugwu. Nkanu West LGA. | 20172018 | Earthworks and Drainage | Community Access Road improved |
11. | Erosion Control/Road Rehabilitation. Stream Tyer Mgbo Road Enugu South LGA. | 2018 | Section completed with Asphalt | Community Access Road improved |
12. | Erosion Control/Road Rehabilitation. Ambassador Gordi Agbo (Chinemeze Akaigwe) Road. Amechi Enugu South LGA. | 20132014 | Section completed with Asphalt | Community Access Road improved |
13. | Erosion Control/Road Rehabilitation. Chidozie Ogbonna Street – Police College Agbanic Road Enugu North LGA. | 2018 | Section completed with Asphalt | Community Access Road improved |
14. | Assistance for Construction of several Projects for Dental College Enugu. | 20102015 | Completed | Improved on Health Education |
15. | Assistance for Construction of several Projects for SEDI, Akwuke Awkunanam Enugu. | 2010 – 2016 | Completed | Science Education improved |
16. | Assistance for Provision of some Infrastructure. UNTH Ituku Ozalla. | 2010 – 2016 | Completed | Health Service Delivery improved |
17. | Assistance for Provision of some Infrastructure. PRODA Enugu. | 2010 – 2016 | Completed | Science Education improved |
18. | Assistance for Provision of some Infrastructure. National Gallery of Arts Enugu. | 2010 – 2016 | Completed | Culture & Tourism improved |
19. | Purchase of Water Tanker for Enugu Airport. | 2007 | Completed | Water Supply assistance |
20. | Provision of Shallow Boreehole, Overhead Tank Storage/Service Reservoir and Public Taps. Ogbeke Enugu East LGA. | 2019 | Completed | Portable Water provided |
21. | Provision of Shallow Boreehole, Overhead Tank Storage/Service Reservoir and Public Taps. Ugwuomu Agric Farm. Enugu East LGA. | 2019 | Completed | Portable Water provided |
22. | Provision of Shallow Boreehole, Overhead Tank Storage/Service Reservoir and Public Taps. Iheuyi Ehamufu. Isi Uzo LGA. | 2019 | Completed | Portable Water provided |
23. | Construction of Open Wells, Siptar for Enugu Correctional Centre, Enugu. | 2022 | Completed | Portable Water provided |
24. | Donation of 1No. 300KVA Transformer and Feeder Pillar Ndi Agbana Umunagwu Amechi Uwani Community. Enugu South LGA. | 2018 | Completed | Power improvement |
25. | Donation of 1No. 200KVA Transformer and Feeder Pillar. Umuchigbo Nike Community. Enugu East LGA. | 2018 | Completed | Power improvement |
PROJECTS IN ENUGU NORTH SENATORIAL ZONE
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Rehabilitation of 9th Mile – Abor – Ukehe – Opi Junction (old road). | 2018 – 2022 | Section completedOngoing | Economic Corridor improved |
2. | Erosion Control/Road Rehabilitation. Ikwoka – Amagu Ajuno Obimo Nsukka LGA. | 20142016 | Completed with Asphalt | Economic Corridor improved |
3. | Erosion Control/Road Rehabilitation. Orie Igboeze – Ovoko Agu. Igboeze South LGA. | 201520162017 | Completed with Asphalt | Economic Corridor improved |
4. | Erosion Control/Road Rehabilitation. Amabokwu Aku – Ogbade. Igboetiti LGA. | 20142015 | Section completed | Economic Corridor improved |
5. | Provision of Water Supply Projeect. Bishop Shanaghan Hospital Nsukka. | 20142015 | Completed | Portable Water provided |
6. | Provision of Water Supply Projeect. Oshigo Aku. Igboetiti LGA. | 20152017 | Completed | Portable Water provided |
7. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Amala – Obollo, Umuonehe Aji Igboetiti North LGA. | 2017 | Completed | Portable Water provided |
8. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Ette Igboeze North LGA. | 2021 | Completed | Portable Water provided |
9. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Iheaka, Igboeze South LGA. | 2021 | Completed | Portable Water provided |
10. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Ovoko. Igboeze South LGA. | 2021 | Completed | Portable Water provided |
11. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Obimo. Nsukka LGA. | 20152016 | Completed | Portable Water provided |
12. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. St. Theresa Cathedral Facility Nsukka. | 2020 | Completed | Portable Water provided |
13. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Ohebedim. Igboetiti LGA. | 2020 | Completed | Portable Water provided |
14. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Ozi Edem (Twice Abortive). | 20182021 | Funds and Materials cost benefit not realized | |
15. | Provision of Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Nsukka . | 2020 | Completed | Portable Water provided |
ENUGU WEST SENATORIAL DISTRICT GENERAL PROJECTS
- Procurement of Deep Borehole Rig for Water Supply Projects 2007.
- Donation and Distribution of Drugs in many Hospitals.
- Training Farmers on Modern Farming Techniques and Distribution of Improved Seedlings.
- Training of Farmers on Access to Finance and Insurance for Agricultural Entrepreneurship.
- Medical Outreach on Constituents Optometric Needs.
PROJECTS IN OTHER STATES IN NIGERIA
S/N | LOCATION | FUNDING YEARS | STAGE | IMPACT |
1. | Rural Electrification of Ogollu – Ogbango Enetue Community, adoka District Otukpo LGA Benue State. | 201520182022 | Completed | Improved Community Livelihood |
2. | Erosion Control/Road Rehabilitation. Dr Mancel Ameke Ishiagu Road. Ebonyi State. | 20172019 | Completed with Earthworks and Side Drain | Improved Community Livelihood |
3. | Erosion Control/Road Rehabilitation Ituruaku/Hospital Road. Umuahia Abia State. | 20142016 | Completed | Improved Community Livelihood |
4. | Surface Water Supply, Treatment, Storage and Recticulation. Umukafia Umuahia North LGA Abia State. | 2018 | Completed | Improved Community Livelihood |
5. | Construction of Water Borehole, Overhead Tank Storage/Service Reservoir with Public Taps. Amachara Umuokpara Umuahia. Abia State. | 2018 | Completed | Improved Community Livelihood |
6. | Construction of 1No. Solar Powered Borehole, Provision of Overhead Storage/Service Tank and Public Taps. Ofemiri Ndimoko Ideato North LGA Abia State. | 20172018 | Completed | Portable Drinking Water provided |
7. | Construction of 1No. Borehole, Provision of Overhead Tank Storage/Service Tanks and Public Taps. Nkalagha, Nkalagu LGA, Ebonyi State. | 20172018 | Completed | Portable Drinking Water provided |
8. | Erosion Control/Road Rehabilitation. Nkwo Mmili Ukwu Orakwu. Anambra State. | 20142016 | Completed | Community Access Road provided |
9. | Erosion Control/Road Rehabilitation. Umuibeji Umuahia Abia State. | 20142016 | Completed | Community Access Road provided |
10. | Erosion Control/Road Rehabilitation. Ogbondiku – Amaekpo Umuahia South. | 20142016 | Completed | Community Access Road provided |
11. | Erosion Control/Road Rehabilitation Umuhu – Oboama Umueze – Eziakalakaohu Abo Mbaise. Imo State. | Completed | Community Access Road provided | |
12. | Erosion Control/Road Rehabilitation. Echana Mgbom – Iyioka Junction, afikpo North LGA, Ebonyi State. | 201520162018 | Completed | Community Access Road provided |
13. | Erosion Control/Road Rehabilitation. Irukalita/Ngwulu Agu Village, Enugu Agidi Njioka LGA, Anambra State. | 2017 | Completed | Community Access Road provided |
14. | Erosion Control/Road Rehabilitation. Oye Ukpo – Ezicheke – Ezekwesili Penticost Church Road Dunukofia LGA, Anambra State. | 2016201720192020 | Completed | Community Access Road provided |
15. | Erosion Control/Road Rehabilitation. Okpudho – Ikata Road Edeoha Ayagoko Ula – Ukpata Road Ahoada East LGA Rivers State. | 2017 | Completed | Community Access Road provided |
16. | Erosion Control/Road Rehabilitation. Ndiagu – Ezima – Akiliyi Nkalagu. Ishielu LGA Ebonyi State. | 2017 | Completed | Community Access Road provided |
17. | Provision of Water Borehole, Overhead Tank Storage/Service Reservoir Umuikedilo Eziama Ibiasoegbe, Orlu – West LGA, Imo State. | 20172018 | Completed | Portable Drinking Water provided |
18. | Provision of 1No. Motorized Borehole, Overhead Tank Storage/Service Tank and Public Taps. Okwoko Village Nkporo Ohafia LGA Abia State. | 20172018 | Completed | Portable Drinking Water provided |
19. | Rehabilitation of Water Borehole, Conversion to Solar. Okpalla, Ngor Okpalla LGA Imo State. | 20172018 | Completed | Portable Drinking Water provided |
20. | Provision of Water Borehole, Overhead Tank Storage/Service Tanks and Public Taps. Inikiri Effuim. Ohankwu LGA Imo State. | 2017 | Completed | Portable Drinking Water provided |
21. | Rehabilitation of Ife Water Supply Scheme, Umuoruo Ife, Ezinchite Mbaise Imo State. | 20162017 | Completed | Portable Drinking Water provided |
22. | Provision of 1No. Borehole, Overhead Tank Storage/Service Tank and Public Taps. Ugwuala – Osuachara Isiala Mbano LGA Imo State. | 20162017 | Completed | Portable Drinking Water provided |
23. | Rehabilitation of Egberu Mputu Water Scheme. Isiala Ngwa South LGA Abia State. | 20142015 | Completed | Portable Drinking Water provided |
24. | Provision of Solar Powered Borehole Water Project and Reticulation Ozziza Village Afikpo North LGA Ebonyi State. | 20142015 | Completed | Portable Drinking Water provided |
25. | Provision of Motorized Borehole, Overhead Storage Tank/Service Reservoir and Public Taps. Nkwo Nnewi Market. Anambra State. | 20172018 | Completed | Portable Drinking Water provided |
26. | Construction of 1No. 2 Bedroom Flat, 3No. 1 Bedroom Flat Terrace Building Teachers Quarters Ughelli South LGA Delta State. | 20172018 | Completed | Improved on Teachers Welfare |
27. | Donation of 1No. 200KVA and 1No. 300KVA Transformer and Feeder Pillar Enugu Agidi Community Anambra State. | 2018 | Completed | Improved on Power Supply |
28. | Donation of 1No. 300KVA Transformer and Feeder Pillar Umuoshie Oboama enyiogugu Aboh Mbaise LGA Imo State. | 2018 | Completed | Improved on Power Supply |
29. | Donation of 1No. 300KVA Transformer and Feeder Pillar Umuduru Ezimba Ogberuru Orlu LGA Imo State. | 2018 | Completed | Improved on Power Supply |
30. | Erosion Control/Road Rehabilitation. Amucheazi Umunachi Road Dunu Kofia LGA Anambra State. | 20172018 | Section completed | Community Access Road improved |
31. | Erosion Control/Road Rehabilitation. Umudema Nbubo Amasa Nsulu Ishiala Ngwa North LGA Abia State. | 20172018 | Section completed | Community Access Road improved |